Ads 468x60px

Galaxy on Fire 2 v2.0.2Unlimited Apk + data

Galaxy on Fire 2™ THD
Version: 2.0.2Unlimited Size: 971 MB Required: Android 2.1 and up Developers: FISHLABS Entertainment 
 Overview:  
 Galaxy on Fire 2™ THD, the critically acclaimed and multi award-winning outer space epos for mobile devices

[ For an ideal gaming experience on smartphones and tablets running Android 4.2 or higher, please enable 4xMSAA in the developer options. ]
# # # AN UNPRECEDENTED OUTER SPACE ADVENTURE # # #
Galaxy on Fire 2™ HD is the fully optimized Google Play version of Fishlabs’ multi-award-winning space combat and trading simulation. With cutting-edge 3D graphics, an unprecedented depth of gameplay and 10+MM installs over all kinds of mobile platforms, the title is rightfully considered a benchmark of sci-fi gaming on smartphones and tablets by fans and media alike!
# # # A CONTINUOUS STREAM OF NEW ADVENTURES # # #
In the game, you take over the role of the hot-headed space war veteran Keith T. Maxwell and save the galaxy from its impeding destruction by the hands of devious alien raiders, ruthless space pirates and power-crazy madmen! Besides the 10+ hours campaign of the main game, you can also take on two additional adventures by unlocking the extensive story add-ons Valkyrie™ and Supernova™. Granting exclusive access to tons of new missions and content, they are available via in-app purchase and can be enjoyed right away, no matter how far you’ve progressed in the main storyline!
In addition, you can also buy various credit packs and purchase your own space station, the infamous Kaamo Club, in order to stock valuable goods and park or even pimp your favourite space ships.
# # # TRUST THE MEDIA # # #
The international press loves Galaxy on Fire 2™ HD and says “that currently there is no other game on Android that could rival GOF2 in terms of complexity” (Chip.de) and that it “takes mobile gaming to a whole new level with its amazing details and rich gameplay” (AndroidPolice.com).
# # # TRUST THE FANS # # #
The fans have given Galaxy on Fire 2™ HD thousands of 5-star ratings! According to them, it resembles “Elite on the Commodore 64, but with amazing graphics” (E.K. Hartley) and is “so addicting, I played for an hour and it felt like 15 minutes” (S. Wickstrom).
# # # HUNDREDS OF UNIQUE FEATURES # # #
• Achievements and leaderboards via Google Play game services (GPGS)
• A vast galaxy with over 30 star systems and more than 100 planets and space stations
• More than 50 customizable spaceships and hundreds of different weapons systems, power-ups and commodities
• A unique mixture of story-driven, mission-based and sandbox gameplay
• High-quality visuals including detailed 3D models, hi-res textures and breath-taking Special FX
• 3D sound, orchestral soundtrack and full voice-acting
• Action Freeze™: Take screenshots from any perspective and save them onto your device
• Full support of the differing resolutions and capabilities of 200+ Android-powered smartphones and tablets
# # # JOIN THE COMMUNITY # # #
Get in touch with thousands of other Galaxy on Fire 2™ fans through our official website, forums and social media profiles! We’re looking forward to hear from you!
Official Galaxy on Fire Homepage - http://www.galaxyonfire.com/
Official Galaxy on Fire Newsletter - http://bit.ly/gof2-newsletter
Official Fishlabs Homepage - http://www.fishlabs.net/
Official Fishlabs Forums - http://forums.fishlabs.net/en
Official GOF2 HD Trailer - http://bit.ly/gof2-hd-trailer
Like GOF on Facebook - http://www.facebook.com/galaxyonfire
Like us on Facebook - http://www.facebook.com/fishlabs
Follow us on Twitter - http://www.twitter.com/fishlabs
Check us out on YouTube - http://www.youtube.com/fishlabsgames
# # # HARDWARE REQUIREMENTS # # #
Galaxy on Fire 2™ HD requires Android 3.0 or higher (i.e. Honeycomb, Ice Cream Sandwich or Jelly Bean).
Cover art
What's in this version:
- “GOF Heritage Week” with lots of exclusive special offers: 50% price cut on 10,000,000 credits as well as Valkyrie, Supernova and the Add-on Bundle!
- Minor bug fixes and improvements. 

KW:  Galaxy on Fire 2  apk free download android games apktot

App Screenshots


0 Comments:

Post a Comment

 

ABOUT

Apktot is a site that provides information for free on android apps, games for android, themes, and anything related to Android. Apktot gather the most updated information, and will continue to be updated on a daily basis. Here, we hope to help you. Your support really helped us. Link Dead?? How to Root Your Android Device

DISCLAIMER

We Apktot Sharing Software and other resources are reproduced from the forum or blog. If any of the Contents in this site Against your Copyright, please Contact us or Commenting in the post. We will Remove your Content As Soon As Possible.

relate

Followers